Infrastructure

Power supply:

  • there is a construction project of an electrical substation with a 22 mW capacity

Gas supply:

  • currently the gas supply of the industrial park is carried out in the volume sufficient for the construction of investment projects. A high-pressure gas pipeline was built and a gas distribution unit was installed.

Water supply and water disposal:

  • separate water intake and treatment facilities are planned to be put into operation in 2021.

Roads:

  • motor roads of IV category.

Telecommunications:

  • a range of service providers is available.

Financial measures to support the industrial park residents

  • Lot rent for the construction period is 0.01 rubles per 1 hectare.
  • Technological connection to the industrial park engineering networks is free of charge.