Infrastructure
Power supply:
- there is a construction project of an electrical substation with a 22 mW capacity
Gas supply:
- currently the gas supply of the industrial park is carried out in the volume sufficient for the construction of investment projects. A high-pressure gas pipeline was built and a gas distribution unit was installed.
Water supply and water disposal:
- separate water intake and treatment facilities are planned to be put into operation in 2021.
Roads:
- motor roads of IV category.
Telecommunications:
- a range of service providers is available.
Financial measures to support the industrial park residents
- Lot rent for the construction period is 0.01 rubles per 1 hectare.
- Technological connection to the industrial park engineering networks is free of charge.